Welcome to in-situ painting

A1 Powder Coatings is registered with Constructionline and has a dedicated site team working to ICORR standards as required by principal contractors, as well as CSCS certification for all employees.

The team
Our standard site team consists of:

  • Site Safety Supervisor (risk assessment, PPE, safe ways of working)

  • Foreman (productivity, site/client liaison)

  • Trained applicators (preparation, production & site cleanliness)

  • Shot-blasting (capable of course & fine blast operations using our mobile facilities)

  • Mobile platform operatives (access at height)

  • Subject matter experts offering technical advice about durability and suitablility of products

Clients
National Grid (NG) have commissioned A1 for their prestigious Marchwood Southampton power station build. This requires exacting standards of workmanship and rigorously maintained records of processes and equipment. To ensure compliance there is monitoring by NG appointed inspectors at all stages of processes used.

Network Rail commission A1 for bridge refurbishment at many UK locations. This involves multi-paint coating systems to ensure guaranteed life times of finished products.

Retail Outlets throughout the UK regularly contract A1 to customise their corporate finishes ie. shop fronts and signage.  This type of work has taken place during quiet hours, within shopping malls and high street locations, demonstrating our flexibility to accommodate customer needs.

 

Building maintenance has consisted of both remedial and routine refinishing where clients have planned scheduled refurbishment, or where a previous process has failed to meet the operating environment through unexpected conditions ie., polution & weather extremes.  For these examples A1 has the ability to help plan a more suitable finishing option with regard to budget and longevity.